|
| CIVIL ENGINEERINGINVOLVEMENT IN THE ADVANCED ENGINEERING STUDY FOR PROPOSED DOWNTOWN LINE STAGE 2 (SECTION 2) & STAGE 3 (PACKAGES A & C) RAPID TRANSIT SYSTEM OF SINGAPORE Conduct Visual Inspections and Condition Surveys for both Infrastructures and buildings within the proposed study corridor of the tunnel profile P [more] |
|
|